Decision Maker: Local Planning Panel
Decision status: Recommendations Determined
The Panel granted consent to Development Application
Number strikethrough):
(3)
RELIANCE ON
PREVIOUS DEVELOPMENT CONSENT D/2022/456, AS AMENDED
(a) This
development consent relies on, and must be read in conjunction with, the base
development consent D/2022/456 (as modified by D/2022/456/A amended).
(b) This consent is subject to compliance with conditions of consent contained in D/2022/456 (as amended), in particular:
(i)
Condition (1) Approved Development
(ii)
Condition (2) Design Modifications
(iii)
Condition (3) Strata Subdivision – Development Consent
(iv)
Condition (4) Approved Design Rooftop Plant
(v)
Condition (5) Building Height
(vi)
Condition (8) External Lighting
(vii)
Condition (9) No Air Conditioning Units to Façade or Balconies of
Building
(viii)
Condition (10) Associated Roadway Costs
(ix)
Condition (11) Cost of Signposting
(x)
Condition (12) Vehicle Access
(xi)
Condition (13) No Obstructions or Encroachments
(xii)
Condition (14) – Tactile Ground Surface Indicators and Handrails
(xiii)
Condition (15) Trees Approved for Removal
(xiv)
Condition (16) Tree Protection Zone
(xv)
Condition (17) Affordable Housing Contribution – Residual Lane or Central
Sydney – Payment in lieu of floor space contribution – Prior to Construction
Certificate
(xvi)
Condition (18) Public Art
(xvii)
Condition (19) Retention of Existing Rock Outcrop
(xviii)
Condition (20) Visual Privacy Screening Details
(xix)
Condition (21) Reduction of Noise from External Sources (Residential and
Serviced Apartments)
(xx)
Condition (22) Sites in the Vicinity of Buildings within a Heritage
Conservation Area
(xxi)
Condition (23) Materials and Samples Board – Major Development
(xxii)
Condition (24) Mechanical Ventilation
(xxiii)
Condition (25) Reflectivity
(xxiv)
Condition (26) Letterboxes
(xxv)
Condition (27) Allocation of Parking
(xxvi)
Condition (28) Bicycle Parking
(xxvii)
Condition (29) Parking Design
(xxviii)
Condition (30) Telecommunications Provisions
(xxix)
Condition (31) Utility Services
(xxx)
Condition (32) Structural Certification for Design – National
Construction Code (All Building Classes)
(xxxi)
Condition (33) – BASIX Certificate – Details to be lodged with a
Construction Certificate
(xxxii)
Condition (34) External Walls and Cladding Flammability
(xxxiii)
Condition (35) Construction Traffic Management Plan
(xxxiv)
Condition (36) Demolition, Excavation and Construction Noise and
Vibration Management Plan
(xxxv)
Condition (37) Dilapidation Report – Public Domain
(xxxvi)
Condition (38) Survey Infrastructure – Identification and Recovery
(xxxvii)
Condition (39) Public Domain Levels and Gradients
(xxxviii)
Condition (40) Stormwater Drainage Design
(xxxix)
Condition (41) Stormwater Drainage Connection
(xl)
Condition (42) Stormwater On-Site Detention
(xli)
Condition (43) Temporary Dewatering During Construction
(xlii)
Condition (45) Waste and Recycling Management – Residential
(xliii)
Condition (46) Waste and Recycling Management – General
(xliv)
Condition (47) Landscaping of the site
(xlv)
Condition (49) Signal system
(xlvi)
Condition (50) Mechanical parking facilities (car lift and vehicle
turntable)
(xlvii)
Condition (51) Tree Pruning Specification Report
(xlviii)
Condition (52) Demolition, Excavation and Construction Management
(xlix)
Condition (53) Dilapidation Report – Major Excavation/Demolition
(l)
Condition (54) Road Opening Application
(li)
Condition (55) Rodent Treatment Programme – Pre Demolition and/or
Excavation
(lii)
Condition (56) Hazardous Materials Survey Required
(liii)
Condition (57) Public Domain Work – Construction Approval under Section
138 Roads Act 1993
(liv)
Condition (58) Sydney Certificate (TAP-IN)
(lv)
Condition (59) Other Approvals
(lvi)
Condition (60) Survey
(lvii)
Condition (61) Hours of Work and Noise
(lviii)
Condition (62) Application for Hoardings and Scaffolding Installed On or
Above a Public Road and Operating Hoisting Devices including Building
Maintenance Units over a Public Road
(lix)
Condition (63) Loading and Unloading During Construction
(lx)
Condition (64) No Obstruction of Public Way
(lxi)
Condition (65) Use of Mobile Cranes
(lxii)
Condition (66) Covering of Loads
(lxiii)
Condition (67) Erosion and Sediment Control
(lxiv)
Condition (68) Vehicle Cleansing
(lxv)
Condition (69) Compliance with Demolition, Excavation & Construction
Noise and Vibration Management Plan
(lxvi)
Condition (70) Asbestos Removal Works
(lxvii)
Condition (71) Classification of Waste
(lxviii)
Condition (72) Notification – New Contamination Evidence
(lxix)
Condition (73) Stockpiles
(lxx)
Condition (74) Imported Fill Materials
(lxxi)
Condition (75) Hazardous and Industrial Waste
(lxxii)
Condition (76) Use of High Noise
Emission Appliances / Plant
(lxxiii)
Condition (77) Public Domain Plan Detailed Documentation for Construction
(lxxiv)
Condition (78) Hold Points
(lxxv)
Condition (79) Public Domain Works Security Bond
(lxxvi)
Condition (80) Tree Protection Plans
(lxxvii)
Condition (81) Site Supervision and Reporting
(lxxviii)
Condition (82) Archaeological Discovery During Excavation
(lxxix)
Condition (83) Sydney Water
Certificate
(lxxx)
Condition (84) Protection of Stone Kerbs
(lxxxi)
Condition (85) Notification of Excavation Works or Use of High Noise
Emission Appliances/Plant
(lxxxii)
Condition (86) Site Notice of Projects Details and Approvals
(lxxxiii)
Condition (87) Overhead Powerlines – Ausgrid Condition
(lxxxiv)
Condition (88) Underground Cables – Ausgrid Condition
(lxxxv)
Condition (89) Stromwater Completion Deed of Agreement and Positive
Covenant
(lxxxvi)
Condition (90) Restriction on Residential Development
(lxxxvii)
Condition (91) Restriction on Use of Car Spaces – Residential
(lxxxviii)
Condition (92) Survey Certificate at Completion
(lxxxix)
Condition (93) Compliance with Hazardous Materials Survey Report
(xc)
Condition (94) Public Domain Works Completion
(xci)
Condition (95) Survey Infrastructure – Restoration
(xcii)
Condition (96) Public Domain Completion – Work as Executed Documentation
(xciii)
Condition (97) Drainage and Service Pit Lids
(xciv)
Condition (98) Public Domain Damage Security Bond
(xcv)
Condition (99) Traffic Management Plan
(xcvi)
Condition (100) BASIX
(xcvii)
Condition (101) Submission of Electronic CAD Models prior to Occupation
Certificate
(xcviii)
Condition (102) Occupation Certificate to be submitted
(xcix)
Condition (103) Encroachments – Neighbouring Properties
(c)
Condition (104) Encroachments – Public Way
(ci)
Condition (105) Ventilation Minor Works
(cii)
Condition (106) Car Park Ventilation
(ciii)
Condition (107) Defects Liability Period – Public Domain Works
(civ)
Condition (108) Emissions
(cv)
Condition (109) Annual Fire Safety Statement Form
(cvi)
Condition (110) Number of Adults Per Room
(cvii)
Condition (111) Waste/Recycling Collection
and
is subject to compliance with the Terms of Approval for Integrated Development
as advised by Water NSW contained in Schedule 3 of D/2022/456 (as amended), in
particular:
(cviii)
Condition (113) GT0116-00001
(cix)
Condition (114)
GT0117-00001
(cx)
Condition (115)
GT0118-00001
(cxi)
Condition (116)
GT0119-00001
(cxii)
Condition (118)
GT0121-00001
(cxiii)
Condition (119)
GT0122-00001
(cxiv)
Condition (120)
GT0123-00001
(cxv)
Condition (121)
GT0150-00001
(cxvi)
Condition (122)
GT0151-00001
(cxvii)
Condition (123) GT0152-00001
(cxviii)
Condition (124)
GT0155-00001
(c) This consent is not subject to compliance with the following conditions contained in D/2022/456 (as amended):
(i)
Condition (6) Window Operability to Unit 6 Rooftop Retreat
(ii)
Condition (7) Non-Trafficable Rooftop Space
Reason
To ensure consistency between the approved development
under D/2022/456 (as amended) and this amended development application.
The application was approved for the following reasons:
(A)
The proposal will
deliver an appropriate design outcome for the Level 7 rooftop terrace that will
not result in detrimental impacts on view corridors. The proposal therefore
demonstrates design excellence pursuant to Clause 6.21C(2)(c) of the Sydney
LEP.
(B) The proposal will be designed to achieve an acceptable level of visual privacy for the residents of neighbouring buildings. The proposal therefore demonstrates design excellence pursuant to Clause 6.21C(2)(d)(vii) of the Sydney LEP.
(C)
The proposal
will not result in unacceptable acoustic impacts on neighbouring properties.
The proposal therefore demonstrates design excellence pursuant to Clause
6.21C(2)(d)(vii) of the Sydney LEP and is consistent with Section 4.2.3.11
of the Sydney DCP.
(D)
The proposal
will deliver an acceptable landscaping outcome for the approved development.
The proposal therefore demonstrates design excellence pursuant to Clause
6.21C(2)(d)(xiii) of the Sydney LEP and is consistent with Section 4.2.3.5
of the Sydney DCP.
(E)
The proposal
satisfies BASIX and environmental requirements as per State Environmental
Planning Policy (Sustainable Buildings) 2022 and Section 3.6 of the Sydney DCP,
noting that an updated BASIX certificate has been submitted for this amending
DA.
(F)
Condition 3
was amended to correct two minor administrative errors.
Carried unanimously.
D/2025/89
Report author: Kerryanne Lewis
Publication date: 29/07/2025
Date of decision: 23/07/2025
Decided at meeting: 23/07/2025 - Local Planning Panel