Decision Maker: Central Sydney Planning Committee
Decision status: Recommendations Determined
Moved by the Chair (the Lord Mayor), seconded by Councillor Miller -
It is resolved that consent be granted to State Significant Section
4.55(2) Application Number D/2017/349/A (SSD 8105-Mod-1) subject to the
amendment of the following conditions (with additions shown in bold
italics and deletions shown in strikethrough), as follows:
Approved Development Description:
State Significant Development (SSD 8105) for a building
envelope and concept approval for the construction and use of a 50
storey (RL198.22) RL
208.60 mixed use building providing hotel, retail and residential
uses, with basement parking.
(Amendment A – 19 June 2025)
(2)
APPROVED DEVELOPMENT
(a)
Development must be in accordance with State
Significant Development Application No. SD 16_8105 dated 21 March 2017 and the
following drawings prepared by FJMT FJC Studio:
|
Drawing Number |
Title |
Date |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100 |
Stage
1 Envelope Modification_Plan RL +63.250m |
22
August 2024 |
|
101 |
Stage
1 Envelope Modification_Plan RL +84.610m |
22 August
2024 |
|
102 |
Stage
1 Envelope Modification_Plan RL +97.210m |
22
August 2024 |
|
103 |
Stage
1 Envelope Modification_Plan RL +141.300m |
22
August 2024 |
|
104 |
Stage
1 Envelope Modification_Plan RL +176.600m |
22
August 2024 |
|
105 |
Stage
1 Envelope Modification_Plan RL + 189.290m |
22
August 2024 |
|
106 |
Stage
1 Envelope Modification_Plan RL +199.330m |
22
August 2024 |
|
107 |
Stage
1 Envelope Modification_Plan RL +209.800m |
22
August 2024 |
|
201 |
West
Elevation |
22
August 2024 |
|
202 |
South
Elevation |
22
August 2024 |
|
203 |
North
Elevation |
22
August 2024 |
|
204 |
East
Elevation |
22
August 2024 |
|
501 |
Stage
1 Envelope Modification_Axonometry |
22
August 2024 |
and as amended by
the conditions of this consent.
(b) In the event of any inconsistency between the approved plans and supplementary documentation, the drawings will prevail.
(Amendment A – 19 June 2025)
The height of the
building must not exceed RL
198.22 (AHD) RL 208.60(AHD) to the top of the building and RL
69.89 (AHD) to the parapet of the podium, and RL 76.00 (AHD)
to the top of the podium.
(Amendment A – 19 June 2025)
(11)
DETAILED DESIGN OF BUILDING
The Design Brief for the competitive design process and subsequent detailed Development Application must incorporate the following design requirements/ details:
(a) Any structures or landscaping located on the upper level of the podium (above RL 69.89) are to be located and designed with regard to view sharing and privacy of adjoining residential development at 27 Park and 197 Castlereagh Street.
(b) The Stage 2 Development Application must demonstrate a compatible response to the surrounding area in terms of facade treatments, articulation, massing and architectural character.
(c) The length of the podium along Elizabeth and Castlereagh Street is to be relieved by modelling that interprets nineteenth century subdivision patterns.
(d) The design of the podium is to ensure that significant views to and solar access to the sandstone facade of St Georges Church at 201A Castlereagh Street are maintained.
(e) The podium should incorporate high quality materials including ‘Yellowblock’ sandstone quarried locally in the Sydney basin.
(f) The tower is to be articulated to ameliorate wind impacts at street level and in Hyde Park.
(g) Any through-site link must be designed in accordance with Section 3.1.2.2 of Sydney Development Control Plan 2012.
(h)
There
is to be no continuous awning in Elizabeth Street. Any awning is to be limited
to entrances;
(i) All street trees surrounding the site are to be retained.
(j) The Stage 2 Development Application must demonstrate that the development is capable of achieving acceptable solar access to living room windows and private open space in accordance with the criteria contained in the Apartment Design Guide.
(k) Extensive glazing that is unprotected from mid-summer sunlight is to be avoided. The detailed design must not rely on high performance tinting or glazing as a sun control device.
(Amendment A – 19 June 2025)
Any
Development Application for the detailed design and construction of the
development must be accompanied by a signage strategy for the building. The
signage strategy must include information and scale drawings of the location,
type, construction, materials and total number of signs for the building.
(Amendment A – 19 June 2025)
The application was approved for the following reasons:
(A) The development is consistent with the strategic planning framework established for the site. In particular, the proposal is consistent with the Greater Sydney Region Plan and the Eastern City District Plan as it supports an increase in tourist and residential assets within the Central Business District and will foster a lively and engaging city.
(B) The development as modified is substantially the same as was originally approved and is consistent with the requirements of Section 4.55(2) of the Environmental Planning and Assessment Act, 1979.
(C) The development has been considered against the reasons given by the Central Sydney Planning Committee for the grant of consent that is to be modified, and the proposal is consistent and acceptable, as per Section 4.55(3) of the Environmental Planning and Assessment Act, 1979.
(D) The proposed modifications ensure that the detailed design development application is consistent with the concept approval to satisfy Section 4.24 of the Environmental Planning and Assessment Act, 1979.
(E) The proposal is consistent with the aims, objectives, and relevant provisions of the Sydney Local Environmental Plan 2012 for the reasons set out in the report.
(F) The proposed building envelope is able to accommodate a future building design which is capable of exhibiting design excellence in accordance with Clause 6.21C of the Sydney Local Environmental Plan 2012.
(G) The increased height and changes to setbacks of the building envelope are in keeping with the desired future character of the area and will not adversely impact the amenity of the surrounding area. These variations are reasonable and justified with regard to the Detailed Design State Significant Development Application D/2024/854 (SSD 64090972).
(H) The changes to the approved building envelope are appropriate and are not likely to significantly impact the overall use of the building or the amenity of surrounding sites or locality.
(I) The development, as modified, is in the public interest.
Carried unanimously.
D/ D/2017/349/A
Report author: Jessica Symons
Publication date: 30/06/2025
Date of decision: 19/06/2025
Decided at meeting: 19/06/2025 - Central Sydney Planning Committee
Accompanying Documents: