Decision Maker: Central Sydney Planning Committee
Decision status: Recommendations Determined
Moved by the Chair (Ms Galvin), seconded by Councillor Miller -
It is resolved that consent be granted to
Development Application Number strikethrough):
(a) Development must be in accordance with
Development Application No. D/2024/1018 dated 18 November 2024 (as amended) and
the following drawings prepared by SJB:
|
Drawing Number |
Revision |
Drawing Name |
Date |
|
Demolition Plans |
|||
|
DA-0251 |
11 |
Demolition Plan – Basement 02 |
17/09/2025 |
|
DA-0252 |
11 |
Demolition Plan – Basement 01 |
17/09/2025 |
|
DA-0253 |
11 |
Demolition Plan – Level 00 |
17/09/2025 |
|
DA-0254 |
11 |
Demolition Plan – Level 01 |
17/09/2025 |
|
DA-0255 |
11 |
Demolition Plan – Level 02 |
17/09/2025 |
|
DA-0256 |
11 |
Demolition Plan – Level 03 |
17/09/2025 |
|
DA-0257 |
11 |
Demolition Plan – Level 04 |
17/09/2025 |
|
DA-0258 |
11 |
Demolition Plan – Level 05 |
17/09/2025 |
|
DA-0259 |
11 |
Demolition Plan – Level 06 |
17/09/2025 |
|
DA-0260 |
11 |
Demolition Plan – Level 07 |
17/09/2025 |
|
DA-0261 |
11 |
Demolition Plan – Roof |
17/09/2025 |
|
Floor Plans |
|||
|
DA-1001 |
7 |
Floor Plan – Basement 02 |
15/05/2025 |
|
DA-1002 |
12 |
Floor Plan – Basement 01 |
17/09/2025 |
|
DA-1003 |
12 |
Floor Plan – Level 00 |
17/09/2025 |
|
DA-1004 |
8 |
Floor Plan – Level 01 |
17/09/2025 |
|
DA-1005 |
8 |
Floor Plan – Level 02 |
17/09/2025 |
|
DA-1006 |
8 |
Floor Plan – Level 03 |
17/09/2025 |
|
DA-1007 |
8 |
Floor Plan – Level 04 |
17/09/2025 |
|
DA-1008 |
8 |
Floor Plan – Level 05 |
17/09/2025 |
|
DA-1009 |
8 |
Floor Plan – Level 06 |
17/09/2025 |
|
DA-1010 |
8 |
Floor Plan – Level 07 |
17/09/2025 |
|
DA-1011 |
8 |
Floor Plan – Roof |
17/09/2025 |
|
Elevations |
|||
|
DA-1401 |
8 |
Elevations – East |
17/09/2025 |
|
DA-1402 |
8 |
Elevations – South |
17/09/2025 |
|
DA-1403 |
7 |
Elevations – West |
15/05/2025 |
|
DA-1404 |
7 |
Elevations – North |
15/05/2025 |
|
DA-1411 |
8 |
Courtyard Elevations – Sheet 1 |
17/09/2025 |
|
DA-1412 |
8 |
Courtyard Elevations – Sheet 2 |
17/09/2025 |
|
Sections |
|||
|
DA-1501 |
7 |
Building Section 1 |
15/05/2025 |
|
DA-1502 |
7 |
Building Section 2 |
15/05/2025 |
|
DA-1503 |
7 |
Building Section 3 |
15/05/2025 |
|
DA-1504 |
8 |
Building Section 4 |
17/09/2025 |
|
DA-1505 |
7 |
Building Section 5 |
15/05/2025 |
|
DA-1506 |
8 |
Building Section 6 |
17/09/2025 |
|
DA-1507 |
8 |
Building Section 7 |
17/09/2025 |
and as amended by the conditions
of this consent.
(b) In the event of any inconsistency between
the approved plans and supplementary documentation, the drawings will prevail.
(c) The consent provides in principle concept
approval for additional hotel and pub use across all levels of the buildings
comprising the following ancillary uses:
(i) Food
and drink premises
(ii) Hotel and Hotel Accommodation
(iii) Ancillary uses relating to the Hotel and
Motel Accommodation use, including Office premises for the purposes of hotel
administration/back of house and wellness/gym.
Reason
To ensure all parties are aware
of the approved plans and supporting documentation that applies to the
development.
(4)
DETAILED
DEVELOPMENT APPLICATIONS
(a) No consent is granted or implied for the fitout or detailed approval of each individual premises.
(b)
A detailed development consent is required to be
obtained for the fitout and of each individual
premises prior to that fitout or use or
operation of the premises commencing.
(c) Subsequent detailed development applications must be consistent with this consent, including all approved management plans and strategies.
Reason
To require separate consent to
be obtained for a use fitout/operation
of the premises.
The application was approved for the following reasons:
(A) The proposal satisfies the objectives of the Environmental Planning and Assessment Act 1979 in that, subject to the imposition of appropriate conditions as recommended, it achieves the objectives of the planning controls for the site for the reasons outlined in the report to the Central Sydney Planning Committee.
(B) The proposal generally satisfies the objectives and provisions of the Sydney Local Environmental Plan 2012 and Sydney Development Control Plan 2012.
(C) The proposal is consistent with the objectives of the SP5 Metropolitan Centre.
(D) The proposed development has acceptable impacts on the heritage significance of heritage items within the development site. The development is in accordance with the aims and objectives for heritage conservation provided in Clause 5.10 of the Sydney Local Environmental Plan 2012.
(E) The development is considered to exhibit design excellence, consistent with the provisions of Clause 6.21C of the Sydney Local Environmental Plan 2012 and the application demonstrates the site is suitable for the proposed uses, maintains, conserves and enhances the heritage qualities of the subject site and special character area and is of a high standard of architectural design, materials and detailing.
(F) The proposed development is unlikely to result in any significant adverse environmental or amenity impacts on surrounding properties, the public domain, and the broader Central Sydney locality, subject to conditions.
(G) The public interest is served by the approval of the proposal, as amendments to the development application have addressed the matters raised by the City and the community, subject to recommended conditions imposed relating to heritage conservation, waste management and construction management.
(H) Condition 1 was amended to confirm approved use with ancillary uses as demonstrated on architectural drawings.
(I) Condition 4 was amended to clarify that the use and detailed application for the fitout should occur prior to the commencement of the operation.
Carried unanimously.
D/2024/1018
Report author: Marie Burge
Publication date: 29/10/2025
Date of decision: 23/10/2025
Decided at meeting: 23/10/2025 - Central Sydney Planning Committee