Works Zone - Botany Road, Zetland

Decision Maker: Local Pedestrian, Cycling and Traffic Calming Committee

Decision status: Recommendations Determined

Decisions:

2020/577498

 

Recommendations

It is recommended that the Committee endorse the reallocation of the kerb space on the eastern side of Botany Road, Zetland between the points 53 metres and 129 metres south of  Geddes Avenue as "Works Zone 7.30am-5.30pm Mon-Fri, 7.30am-3.30pm Sat" and "No Stopping all other times", subject to the following conditions:

(A)      The Applicant must comply with the Works Zone conditions as stipulated in Schedule C of this agenda.

(B)      The Applicant is not permitted to operate any part of a crane over a public road or hoist/swing goods from a Works Zone across or over any part of a public road by means of a lift, hoist or crane unless a separate approval has been obtained from the City's Construction and Building Certification Services Unit as required under Section 68 of the Local Government Act 1993 and Section 138 of the Roads Act 1993.

(C)      The Applicant must notify adjacent properties of the Works Zone at least 14 days prior to installation and must provide a telephone number of the supervisor responsible for the proposed Works Zone and include contact details in the notification letter to be distributed to affected stakeholders.

(D)      The Applicant must implement appropriate traffic control measures and use TfNSW Accredited Traffic Controllers to maintain local vehicular access and manage pedestrian accessibility adjacent to the Works Zone during the hours of operation.

(E)      The Applicant must temporarily replace the existing kerb and gutter along the Botany Road frontage of the site with a temporary rollover kerb so that vehicles using the Works Zone can drive into the proposed Works Zone. All works must be undertaken to the City’s standards and specifications and to the satisfaction of the City’s Public Domain team and TfNSW.

(F)      The Applicant must remove the temporary rollover kerb and reinstate the kerb and gutter at the conclusion of the Works Zone. All works must be undertaken to the City’s standards and specifications and to the satisfaction of the City’s Public Domain team and TfNSW requirements.

Voting Members for this Item

Voting Members

Support

Object

City of Sydney

ü

 

Transport for NSW

ü

 

NSW Police – South Sydney PAC

ü

 

Representative for the Member for Heffron

ü

 

 

Advice

The Committee unanimously supported the recommendation.

Background

Waterside Constructions has requested a 76 metre long Works Zone in Botany Road.

The Works Zone is to facilitate construction works at 501-509 Botany Road, Zetland.

Publication date: 18/02/2021

Date of decision: 18/02/2021

Decided at meeting: 18/02/2021 - Local Pedestrian, Cycling and Traffic Calming Committee