Decision Maker: Local Planning Panel
Decision status: Recommendations Determined
The Panel:
(A) upheld the variation requested to the height of buildings standard in accordance with Clause 4.6 'Exceptions to development standards' of the Sydney Local Environmental Plan 2012;
(B) upheld the variation requested to the floor space ratio standard in accordance with Clause 4.6 'Exceptions to development standards' of the Sydney Local Environmental Plan 2012; and
(C) granted
consent to Development Application No. strikethrough):
The design of the building must be modified as follows:
(a) The Level 3 planter bed is to be raised in height to the balustrade height across the length of the north elevation terrace.
(b) The ground floor window to the north elevation to the ‘gymnasium area’ must be deleted and infilled.
The modifications are to be submitted to and approved by Council’s Area Planning Manager prior to the issue of a Construction Certificate.
The application was approved for the following reasons:
(A) The proposal is consistent with the objectives of the R1 General Residential Zone.
(B) The proposal generally satisfies the controls relating to dwellings.
(C) The proposal subject to conditions satisfies the provisions of clause 6.21 of Sydney Local Environmental Plan 2012 and demonstrates a high level of design excellence.
(D) Based
upon the material available to the
(i) the applicant’s written request has adequately addressed the matters required to be demonstrated by clause 4.6(3) of the Sydney LEP 2012, that compliance with the height of buildings development standard is unreasonable or unnecessary and that there are sufficient planning grounds to justify contravening clause 4.3 of the Sydney LEP 2012;
(ii) the proposal is in the public interest because it is consistent with the objectives of the R1 General Residential Zone and the height of buildings development standard; and
(iii) the applicant’s written request has adequately addressed the matters required to be demonstrated by clause 4.6(3) of the Sydney LEP 2012, that compliance with the floor space ratio development standard is unreasonable or unnecessary and that there are sufficient planning grounds to justify contravening clause 4.4 of the Sydney LEP 2012; and
(iv) the proposal is in the public interest because it is consistent with the objectives of the R1 General Residential Zone and the floor space ratio development standard.
(E) Condition 2 was amended to remove an unserviceable window and protect the privacy of the adjoining property.
Carried unanimously.
D/2021/759
Report author: Christopher Ashworth
Publication date: 15/12/2021
Date of decision: 15/12/2021
Decided at meeting: 15/12/2021 - Local Planning Panel
Accompanying Documents: