Decision Maker: Local Planning Panel
Decision status: Recommendations Determined
The Panel granted consent to Development Application
No. strikethrough):
(7) MATERIALS AND SAMPLES SCHEDULE
The
detailed design and a detailed
materials, colours and finishes schedule keyed to each elevation of the proposed
seven floating ancillary structures to be used for storage, an office and
amenities must be submitted to and approved by Council’s Area Planning
Manager prior to a Construction Certificate being issued. The materials and
samples schedule/board must not include generic material or colour
descriptions, or use terminology such as ‘or similar’.
Reason
To
require the submission of a materials and samples board following assessment of
the development.
(18) PLAN OF MANAGEMENT
(a)
The Plan of Management, prepared by Environmental Dynamics, dated October
2022 is not approved.
(b)
A revised Plan of Management is to be submitted to and approved by
Council’s Area Planning Manager prior to the issue of a Construction
Certificate that addresses the conditions of this consent, including but not
limited to the following:
(i)
The hours of operation
are limited to those permitted under Condition 17 (noting
that maritime operations must cease between 12 midnight and 7.00am, except for
vessel arrival and departure from the facility).
(ii)
Embarking and/or
disembarking of passengers and patrons from commercial vessels is not
permitted.
(iii)
Speakers and/or noise
amplification equipment must not be installed and music must not be played in
outdoor areas.
(iv)
Section 1.6 must
be amended to state “No group congregations, outdoor music or parties to be
held on the marina pontoons or onboard vessels while secured to the facility.”
(v)
No person or
persons shall reside on any vessel berthed or moored at the marina facility.
(vi)
The plan must
outline a mechanism for the receiving of and recording of complaints and
regular reviewing the plan based on complaints received, in consultation with
Council.
(c)
The Plan of Management must be signed and dated and submitted to Council
prior to the commencement of the use.
(d)
The use must
always be operated / managed in accordance with the Plan of Management approved
by part (b) above. In the event of any inconsistency, the conditions of this
consent will prevail over the Plan of Management.
Reason
To ensure all parties are aware of the approved supporting documentation that applies to the development.
(24) COMMERCIAL BERTHAGE
Commercial
berthage may only be occupied by vessels that have current permits,
certificates, registrations and licenses issued by NSW Maritime
Authority Australian Maritime Safety Authority (or
its successor / international equivalent) that verify they are a “commercial
vessel”. At no times are commercial berths permitted to be occupied or used for
private purposes. Reason To ensure all vessels at the marina have the required
permits.
Reason
To ensure all
vessels at the marina have the required permits.
The application was approved for the following reasons:
(A) The proposal satisfies the objectives of the Environmental Planning and Assessment Act 1979 in that, subject to conditions of consent, it achieves the objectives of the planning controls for the site for the reasons outlined in the report to the Local Planning Panel.
(B) The development is permissible in the zone in accordance with the requirements of the Sydney Local Environmental Plan 2012 and the State Environmental Planning Policy (Biodiversity and Conservation) 2021. The proposed alterations and additions to the existing marina are consistent with the objectives of the B3 - Commercial Core zone and Zone 1 - Maritime Waters.
(C) The development is in accordance with the requirements of the Sydney Development Control Plan 2012 and the Sydney Harbour Foreshore and Waterways Area Development Control Plan 2005 and responds appropriately to heritage items on the site and in the vicinity.
(D) The proposal demonstrates design excellence in accordance with the relevant provisions and matters for consideration in Clause 6.21C of the Sydney Local Environmental Plan 2012.
(E) The proposal has provided sufficient information to address the SEARs.
(F) All other issues have been appropriately addressed by recommended conditions of consent.
(G) Condition 7 was amended to ensure the detailed design and finishes are subject to review and approval.
(H) Condition 18 was amended to update the requirements of the Plan of Management.
(I) Condition 24 was amended to refer to the relevant authority and reference international vessels.
Carried unanimously.
Report author: Samantha Kruize
Publication date: 22/02/2023
Date of decision: 22/02/2023
Decided at meeting: 22/02/2023 - Local Planning Panel