Decision Maker: Local Planning Panel
Decision status: Recommendations Determined
The Panel:
(A) upheld the variation requested to Clause 4.3 'Height of buildings standard' in accordance with Clause 4.6 'Exceptions to development standards' of the Sydney Local Environmental Plan 2012; and
(B)
granted consent to Development Application
Number strikethrough):
The design of the building must be modified as follows:
(a) The bricking in of the two existing Level 1
windows along Grafton Lane to create a ‘recessed brick panel’ is not approved.
The windows must be glazed and match the other Level 1 windows along Grafton Lane
which are being retained.
(b) The proposed water meter and ‘FB Booster’
louvred openings along Grafton Lane must not open over the laneway. Revised
plans demonstrating their operability are required.
(c) Existing brick surfaces are to be repointed where required with the intent of a
consistent finish. A sample board will be supplied and approved prior to the
issue of a Construction Certificate.
(4) RETENTION OF STEEL BEAMS
Unless specified for removal on the approved plans, existing structural steel columns and beams are to be retained.
(5)
MATERIALS
AND SAMPLES – MAJOR DEVELOPMENT
A physical sample board of the proposed glazing and its specifications, keyed to each building
elevation must be submitted to and approved by Council’s Area Planning Manager prior to a Construction Certificate being issued. The proposed glazing
should have a Visible Light Transmittance (VLT) rating of greater than 50% and
have a neutrality of colour.
The glazing
samples board must not include generic material or
colour descriptions or use terminology such as ‘or similar’.
(11)
BUILDING HEIGHT
(a) The
height of the building must not exceed RL26.70 (AHD) to the top of the building
and RL 23.32 24.32 (AHD) to the parapet of the building.
(b) Prior
to an Occupation Certificate being issued, a Registered Surveyor must provide
certification that the height of the building accords with (a) above, to the
satisfaction of the Principal Certifier.
(22)
WASTE AND RECYCLING MANAGEMENT –
GENERAL
Excluding vehicle dimension
requirements, the proposal must comply with the
relevant provisions of Council's Guidelines for Waste Management in New
Developments 2018 which requires facilities to promote the efficient storage,
separation, collection and handling of waste to maximise resources recovery.
(25)
NO
OBSTRUCTIONS
All Any new works to the Buckland Street and Graton
Street public
footways and paths of travel must be free from obstructions. If existing services are required to
be relocated, or new services located, to clear paths of travel
then this must be undertaken at the developer’s expense. All obstructions are to be removed prior to
the issue of any Occupation Certificate.
(46) ALLOCATION OF PARKING
The number of car parking spaces to be provided for the development must
comply with the table below. Details confirming the parking numbers must be
submitted to the satisfaction of the Registered Certifier prior to the issue of
a Construction Certificate.
Car
Parking Type |
Number |
Office
and business parking |
4 |
Accessible
office and business parking |
1 |
Small
rigid vehicle loading dock(s) |
1 |
(51) LEVEL 4 LANDSCAPE TERRACE
(a)
A detailed landscape plan including plans and details drawn to scale, and technical
specification, by a qualified landscape architect must be submitted to and
approved by Council's Area Coordinator Planning Assessments/Area Planning
Manager prior to the issue of a Construction Certificate. These documents must
include:
(i) A
statement that includes details of proposed use of the terrace, accessibility,
and any noise and privacy treatments.
(ii) Location
and details of existing and proposed services, walls, balustrades, planters,
hard surfaces, furniture, screens and shade structures, fixings and other
structural elements that may interrupt waterproofing, including cross-sectional
details of all components.
(iii) Details
of soil types and depth including any mounding. The minimum soil depths for
planting on structure must be 1000mm for trees, 450mm for shrubs and 200mm for
groundcovers, excluding mulch and drainage layers.
(iv) Planting
details, and location, numbers, type and supply size of plant species, with
reference to Australian Standards and preference for drought resistant species
that contribute to habitat creation and biodiversity.
(v) Details
of drainage and irrigation systems, including overflow provisions and water
retention cells in the drainage layer.
(vi) Landscape
terrace maintenance plan. This plan is to be complied with during occupation of
the property and must include any relevant maintenance methodology for safe
working at height such as access requirements, location of any anchor points,
gates, and transport of materials and green waste.
(b)
Prior to the issue of an Occupation Certificate, structural and
waterproofing certifications for the green roof landscaped terrace are to be submitted to and approved by the
Principal Certifying Authority.
(c)
All landscaping in the approved plan must be complete prior to the issue
of an Occupation Certificate.
(54) WASTE AND RECYCLING MANAGEMENT – COMMERCIAL
(a)
The Waste and Recycling Management Plan accompanying this Development
Application has been approved by this consent [Trim 2023/000856].
(b)
All requirements of the approved Waste and Recycling Management Plan must
be implemented during construction and operation of the development and
include:
(i) Dedicated
space to be provided within the development for the storage and recycling of
bulky waste, problem waste, strip out and food waste;
(ii) Collection
points for waste and recycling must be wholly located within the boundary of
the development;
(iii) With
the exception of vehicle size requirements the nominated waste and
recycling storage areas must be constructed to meet the relevant conditions
required by the City's Guidelines for Waste Management in New Developments
2018;
(iv) Provision
and storage within the boundary of the development of waste and recycling receptacles
and any bulky waste at all times;
(v) Commercial
tenancies must have a commercial waste contract(s) in place prior to
commencement of business trading;
(vi) The
path of travel between the bin storage areas/bulky waste storage areas and the
designated waste/recycling collection point is to have a minimum 1,200mm
wall-to-wall clearance, be slip-proof, of a hard surface, be free of
obstructions and at no point have a gradient exceeding 1:14. The use of a lift
is permitted, but consideration should be given to the inclusion of a service
lift in this instance.
Note: The
building manager/strata title manager or body corporate is responsible for
ensuring all tenants are kept informed regarding Council's policies, and best
practice waste and recycling source separation.
UPON
COMPLETION OF THE DEVELOPMENT
(c)
Prior to any Occupation Certificate being issued or the use commencing,
whichever is earlier, the Principal Certifier must ensure that waste handling
works have been completed in accordance with the Waste and Recycling Management
Plan; other relevant development consent conditions; and Council's Guidelines
for Waste Management in New Developments 2018.
(104)
LOADING
DOCK SCHEDULE/REISTER REGISTER
The proposed
loading dock must not be reserved for any other single tenancy, and must be
available to all users within the site.
The
on-site small rigid vehicle loading dock is also to be available for all
tenants for use by removal vehicles, bulky good deliveries and similar. This
shall be managed either by a schedule showing tenants when they can use the
dock, or by a register managed on site to allow tenants to reserve a time
period for their deliveries and to avoid too many deliveries being at the dock
at any one time.
This
information is to be made available to all business/ tenants of the building.
The application was approved for the following reasons:
(A)
Based upon the material available to the
(i) the applicant’s written request has adequately addressed the matters required to be demonstrated by clause 4.6(3) of the Sydney LEP 2012, that compliance with the 'Height of buildings' development standard is unreasonable or unnecessary and that there are sufficient planning grounds to justify contravening clause 4.3 of the Sydney LEP 2012; and
(ii) the proposal is in the public interest because it is consistent with the objectives of the MU1 Mixed Use zone and the 'Height of buildings' development standard.
(B) The proposal satisfies the design excellence provisions of clause 6.21C of the Sydney Local Environment Plan 2012.
(C) The design if the development responds appropriately to the scale of surrounding buildings.
(D) The development, subject to conditions, will not adversely affect the character of the (C9) Chippendale Heritage Conservation Area, and is compatible with the character of the (2.3.1) Chippendale locality.
(E) Conditions 2, 4, 5, 11, 22, 25, 46, 51, 54 and 104 were amended to clarify the scope of the conditions and correct typographical errors.
Carried unanimously.
D/2022/1359
Report author: Thomas Walters
Publication date: 22/09/2023
Date of decision: 20/09/2023
Decided at meeting: 20/09/2023 - Local Planning Panel
Accompanying Documents: