Decision Maker: Central Sydney Planning Committee
Decision status: Recommendations Determined
Moved by the Chair (the Lord Mayor), seconded by Councillor Miller -
It is resolved that consent be granted to section 4.55(1A) application number D/2023/724/A subject to modifications to conditions 2, 11, 21, 28, 29 and 35 as follows.
Modifications are shown in bold italics
(additions) and strikethrough (deletions).
(2)
APPROVED DEVELOPMENT
a) Development must be in accordance with Development Application No. D/2023/724 dated 17 August 2023 and 6 February 2025 and the following drawings prepared by MAKO Architecture Pty Ltd:
Drawing Number |
Drawing Name |
Date |
01100 Rev E |
Setout - Blocks |
23 April 2024 |
01110 Rev G |
Setout – Public Domain |
23 April 2024 |
03100 Rev G |
Structure Plan - Staging |
23 April 2024 |
03101 Rev E |
Structure Plan – Floor Space Allocation |
23 April 2024 |
03200 Rev E |
Structure Plan – Openspace |
23 April 2024 |
03201 Rev E |
Structure Plan – Deep Soil |
23 April 2024 |
04100 Rev |
Setbacks – Gnd Floor |
24 February 2025 |
04200 Rev |
Setbacks – Typical Floor |
|
04700 Rev |
Height of Building - Storeys |
13 February 2025 |
and as amended
by the conditions of this consent.
b)
In the event of any inconsistency between the
approved plans and supplementary documentation, the plans will prevail.
Reason
To ensure all parties are aware of the approved plans and supporting documentation that applies to the development.
(11)
RESIDENTIAL LAND USE
a) The residential component of the development must be designed to comply be consistent with the principles of Chapter 4 of State Environmental Planning Policy (Housing) 2021, the guidelines of the Apartment Design Guide (the ADG), and the provisions of the Sydney Development Control Plan 2012, with particular attention to the following matters:
i. ADG objectives 2F Building separation and 3F-1 Visual privacy;
ii. ADG objective 4B-1 Natural ventilation;
iii. ADG objective 4B-3 Natural cross ventilation;
iv. ADG objective 4J Noise and pollution – with noise and natural ventilation addressed through siting and layout, facade treatment and design and lastly through attenuated passive ventilation devices;
v. DCP provision 3.2.3 Active frontages – with active frontages to be provided to Epsom Road, Link Road and part of Zetland Avenue and George Julius Avenue.
vi. DCP provision 3.2.4 Footpath awnings – with a continuous awning to be provided to Epsom Road, Link Road and part of Zetland Avenue and George Julius Avenue.
vii. A BASIX certificate in accordance with the requirements of State Environmental Planning Policy (Sustainable Buildings) 2022 must be submitted with any subsequent detailed design development application.
Reason
To identify particular planning requirements pertaining to residential land use for the attention of the architects commissioned to undertake the detailed design of the buildings.
(21) LANDSCAPE
DESIGN
Any future detailed design DA must:
a)
Incorporate a 2m landscape setback to all ground
floor residential apartments. This should be provided as deep soil wherever
possible.
b) Demonstrate a coordinated approach to mitigating adverse wind conditions that ensures landscape is only used for this purpose where it is practical, feasible, and results in a high-quality design outcome, and that architectural or site planning solutions are used in all other situations.
c) Demonstrate that 1.5m of clean fill/VENM is available to any landscaped spaces above capped areas of contamination.
Reason
To ensure the provision of a high-quality landscape design and outdoor amenity.
(28) TREES IDENTIFIED FOR REMOVAL
a) For the purposes of the competitive design processes and any subsequent detailed design DA, the trees detailed in the table below are identified for removal.
b) No consent is granted or implied for any tree removal works under this consent. Consent for tree removal must be sought under a subsequent development application.
Tree Number |
Species |
Location |
15,16, 16A, 17A, 17, 26, 28, 29 36, 36A, 36B, 37 - 80 80A, 80B, 81 and 82 – 95 |
Various species |
Within the site |
Reason
To identify trees that may be removed subject to any subsequent detailed design development application.
(29) TREES THAT MUST BE RETAINED
a) For the purposes of the competitive design processes and any subsequent detailed design DA, the trees detailed in the table below are identified for removal.
Tree Number |
Species |
Location |
1A, 1, 2, 2A, 3, 4, 5, 6, 6A, 7, 8, 9, 9A, 9B, 9C, 10, 11, 17A, 17, 18A, 18, 19, 20, 21, 22, 23, 24 and 25. |
Various species |
Within the site |
Reason
To identify trees that must be retained.
(35)
SIGNAGE STRATEGY
A detailed signage strategy must
be submitted with any subsequent detailed design DA or a condition of consent requiring the
submission of a detailed signage strategy is to be imposed on any consent for a
subsequent detailed design development application which involves
non-residential development. The signage strategy must include
information and scale drawings of the location, type, construction, materials
and total number of signs appropriate for the building.
Reason
To require signage to be considered as part of any subsequent detailed building design.
The application was approved for the following reasons:
(A) The proposed modified development is substantially the same as the development to which development consent D/2023/724 was granted and is consistent with section 4.55(1A) of the Environmental Planning and Assessment Act 1979.
(B) The assessment has considered the reasons for approval given by the Central Sydney Planning Committee for the grant of the development consent that is proposed to be modified in accordance with section 4.55(3) of the Environmental Planning and Assessment Act 1979.
(C) The proposed modifications to the approved building envelope and applicable conditions of consent ensures that the detailed development application for Stage NE (D/2024/816) is consistent with the concept approval as required by section 4.24 of the Environmental Planning and Assessment Act 1979.
(D) The proposed modifications to expand the approved building envelope in select and minor locations would not have an unreasonable impact on the amenity of the surrounding development or public domain area and would remain in keeping with the desired future character of the Epsom Park locality.
(E) The
proposed modified building envelope is capable of accommodating a future
building design which is capable of exhibiting design excellence in accordance
with Clause 6.21C of Sydney Local Environmental Plan 2012, as demonstrated by
the concurrent application for Stage NE.
Carried unanimously.
D/2023/724/A
Report author: Michael Stephens
Publication date: 13/03/2025
Date of decision: 13/03/2025
Decided at meeting: 13/03/2025 - Central Sydney Planning Committee
Accompanying Documents: