Decision Maker: Central Sydney Planning Committee
Decision status: Recommendations Determined
Moved by the Chair (the Lord Mayor), seconded by Councillor Thalis -
It is resolved that consent be granted to Section
4.55 Application No. strikethrough (deletions), as follows:
(2) APPROVED DEVELOPMENT
(a) Development
must be in accordance with Development Application No. D/2017/1723 dated 12 December
2017 and the following drawings prepared by Krikis Tayler Architects PTW
Architects:
Drawing Number |
Drawing Name |
Date |
|
|
|
|
|
|
|
|
|
|
|
|
S1DA-0010 Revision A |
Amended Envelope Basement
Floor Plan |
7 August 2020 |
S1DA-0011 Revision A |
Amended Envelope Ground
& 1 Floor Plan |
7 August 2020 |
S1DA-0012 Revision A |
Amended Envelope Level 2
& 3 Floor Plan |
7 August 2020 |
S1DA-0013 Revision A |
Amended Envelope Level 4
& 5 Floor Plan |
7 August 2020 |
S1DA-0014 Revision A |
Amended Envelope Level 6
Floor Plan |
7 August 2020 |
S1DA-0020 Revision A |
Amended Envelope Sections |
7 August 2020 |
S1DA-0030 Revision A |
Amended Envelope Elevations |
22 July 2020 |
as
amended by plans submitted in order to achieve compliance with deferred commencement condition (2) in
Schedule 1 of this consent and the other conditions of this consent.
(b) In the event
of any inconsistency between the approved plans (including plans approved in
accordance with deferred commencement condition (2) in Schedule 1) and
supplementary documentation, the plans will prevail.
(8) PUBLIC ART
(a) The document titled ‘888 Bourke Street, Zetland – Preliminary Public Art Plan’, prepared by Site Image Public Artists, Issue C and dated 31 July 2018 must be included as annexure to the competition brief for the competitive design process.
(b) A
detailed public art plan must be submitted with any subsequent development
application for detailed design and construction of the development.
(c) The A detailed public art plan referred
to in (b) above must be prepared for
any subsequent detailed design proposal in accordance with Section
3.1.5 of the Sydney Development Control Plan 2012, the City of Sydney Public
Art Strategy and Policy and Interim Guidelines for Public Art in Private
Development, and include:
(i) A rationale for the selection of artists.
(ii) A rationale for each artist’s concept relevant to the site.
(iii) An indication of how each artwork concept is commensurate with the scale of the development.
(iv) Provision of public art concepts, including the form, dimensions, materials and locations of the artworks.
(v) A program for documentation, fabrication and installation and integration with the construction program for the development.
(vi) Engineer’s drawings, expected maintenance requirements and deaccessioning agreements.
(d) Neither street furniture nor interpretation strategies must be considered as part of the public art component.
(11) BUILDING HEIGHT
The application was approved for the following reasons:
(A) The development as modified is substantially the same as was originally approved and is consistent with the requirements of Section 4.55(2) of the Environmental Planning and Assessment Act 1979.
(B) The proposed modifications ensure that the detailed design development application is consistent with the concept approval to satisfy Section 4.24 of the Environmental Planning and Assessment Act 1979.
(C) The increased height and bulk of the building envelopes are in keeping with the desired future character of the area and will not adversely impact the amenity of the surrounding area. These variations are reasonable and justified with regard to the detailed design development application.
(D) The proposed building envelopes are capable of accommodating a future building design which is capable of exhibiting design excellence in accordance with Clause 6.21 of the Sydney Local Environmental Plan 2012.
Carried unanimously.
D/2017/1723/A
Speakers
Mr David Milliken (Strategic Perception on behalf of the Owners
Corporation at Emeral Park – 15-17 Joynton Avenue and 5 O’dea Avenue, Zetland),
Mr Terence Huggins (resident), Mr Steve Ryan (resident), Ms Larissa Brennan
(LJB Urban Planning) – on behalf of the applicant, and Ms Siobhan McInerney
(PTW Architects) – on behalf of the applicant, addressed the Central Sydney
Planning Committee on Item 10.
Report author: Jessica Symons
Publication date: 10/12/2020
Date of decision: 10/12/2020
Decided at meeting: 10/12/2020 - Central Sydney Planning Committee
Accompanying Documents: