Works Zone - Goddard Street, Erskineville

Decision Maker: Local Pedestrian, Cycling and Traffic Calming Committee

Decision status: Recommendations Determined

Decisions:

2022/422191

Recommendation

It is recommended that the Committee endorse the reallocation of the kerb space on the western side of Goddard Street, Erskineville, between the points 41.4 metres and 63.4 metres south of Macdonald Street as "Works Zone 7.30am – 5.30pm Mon-Fri 7.30am-3.30pm Sat No Stopping All Other Times”, subject to the following conditions:

(A)      The Applicant must comply with the Works Zone conditions as stipulated in Schedule C of this agenda.

(B)      The Applicant is not permitted to operate any part of a crane over a public road or hoist/swing goods from a Works Zone across or over any part of a public road by means of a lift, hoist or crane unless a separate approval has been obtained from the City's Construction and Building Certification Services Unit as required under Section 68 of the Local Government Act 1993 and Section 138 of the Roads Act 1993.

(C)      The Applicant must notify adjacent properties of the Works Zone at least 14 days prior to installation and must provide a telephone number of the supervisor responsible for the proposed Works Zone and include contact details in the notification letter to be distributed to affected stakeholders.

(D)      If the Works Zone is installed on a footpath, then on removal of the Works Zone, the applicant must restore the footpath to its original condition. All works must be undertaken to the City’s standards and specifications and to the satisfaction of the City’s Public Domain team.

(E)      The Applicant must implement appropriate traffic control measures, use Transport for NSW (TfNSW) Accredited Traffic Controllers to maintain local vehicular access and manage pedestrian accessibility adjacent to the Works Zone during the hours of operation.

(F)       The Applicant must obtain approval from City's Street Lighting team to remove the light pole at the frontage of the property. Upon completion of works, the light pole must be restored to its original condition.

Voting Members for this Item

 

Voting Members

Support

Object

City of Sydney

ü

 

Transport for NSW

ü

 

NSW Police – South Sydney PAC

ü

 

Representative for the Member for Newtown

ü

 

 

Advice

The Committee unanimously supported the recommendation.

Background

Diversified Group Pty Ltd has requested a 22 metre long Works Zone in Goddard Street, Erskineville.

The Works Zone is to facilitate construction works at 1-3 Goddard Street, Erskineville.

Report author: Vicki Calleja

Publication date: 15/09/2022

Date of decision: 15/09/2022

Decided at meeting: 15/09/2022 - Local Pedestrian, Cycling and Traffic Calming Committee