Decision Maker: Local Planning Panel
Decision status: Recommendations Determined
The Panel granted consent to Development
Application No D/2020/766, subject to the conditions detailed in Attachment A to
the subject report, subject to the following amendments (additions shown in bold
italics, deletions shown in strikethrough):
PART A – DEFERRED COMMENCEMENT
CONDITIONS (CONDITIONS TO BE SATISFIED PRIOR TO CONSENT OPERATING)
The consent is not to operate until the following conditions are
satisfied, within 24 months of the date of this determination:
(1)
LAND REMEDIATION – SITE AUDITOR REVIEW
REQUIRED
The above is to be submitted to the satisfaction of
Council’s Area Planning Manager prior to this consent becoming operational.
Evidence that will sufficiently enable Council to be satisfied as to
those matters identified in deferred commencement conditions, as indicated
above, must be submitted to Council within 12 months of the date of
determination of this deferred commencement consent failing which, this
deferred development consent will lapse pursuant to section 4.53(6) of the
Environmental Planning and Assessment Act 1979.
The consent will not operate until such time that the Council notifies
the Applicant in writing that deferred commencement consent conditions, as
indicated above, have been satisfied.
Upon Council giving written notification to the Applicant that the
deferred commencement conditions have been satisfied, the consent will become
operative from the date of that written notification, subject to the conditions
of consent, as detailed in Part B Conditions of Consent (Once the Consent is
Operation) of the subject report.
PART BA - CONDITIONS OF CONSENT
SCHEDULE 1A
APPROVED DEVELOPMENT/DESIGN MODIFICATIONS/COVENANTS AND
CONTRIBUTIONS/USE AND OPERATION
Note: Some conditions in Schedule 1A are to be
satisfied prior to issue of a Construction Certificate and some are to be
satisfied prior to issue of Occupation Certificate, where indicated.
(a) The blank eastern wall of the development is to be modified with consideration provided to the expression of joints and panel sizes, in the event that the adjacent site is not developed in the near future. Amended drawings detailing the proposed panel layout and sizes and including 1:10 details of the panel joints are required. A high level of finish and detailing must be represented on the amended drawings.
(b)
The door of the Sophia
Street garage entry is to be a folding glass door.
The above modifications are
to be submitted to and approved by Council’s Area Planning Manager prior to the
issue of a Construction Certificate.
(85) LAND REMEDIATION
The site
is to be remediated and validated in accordance with the Remedial Action Plan prepared by “JK Environments”, Ref: E32153PLrpt3-RAP, dated 11 February 2021 and the Site Audit Statement required under
Deferred Commencement Condition 1 of this consent Letter of Interim
Advice or Section B Site Audit Statement prepared by NSW Environment Protection
Authority accredited Site Auditor, Louise Walkden (EPA Accredited Site Auditor
1903), dated 15 March 2021, Ref no 318001143.
Any
variations to any approved Remediation Action Plan shall be approved in writing
by the Site Auditor and Council's Area Coordinator Planning Assessments / Area
Planning Manager prior to the commencement of such work.
Reasons for Decision
The application was approved for the following reasons:
(A) The development complies with the objectives of the B4 Mixed Use zone pursuant to the Sydney Local Environmental Plan 2012.
(B) Based upon the material available to the Panel at the time of determining this application, the Panel is satisfied that:
(i) the applicant’s written request has adequately addressed the matters required to be demonstrated by clause 4.6(3) of the Sydney LEP 2012, that compliance with the floor space ratio development standard is unreasonable or unnecessary and that there are sufficient planning grounds to justify contravening clause 4.4 of the Sydney LEP 2012; and
(ii) the proposal is in the public interest because it is consistent with the objectives of the B4 Mixed Use zone and the floor space ratio development standard.
(C) The proposal meets the objectives of the Apartment Design Guide and is consistent with the design quality principles under the State Environmental Planning Policy No. 65 - Design Quality of Residential Apartment Development.
(D) The development complies with the Height of Buildings development standard pursuant to Clause 4.3 of the Sydney Local Environmental Plan 2012.
(E) The development exhibits design excellence and appropriately responds to the context of the site. The development is consistent with the desired future character of the area as per Clause 6.21 of the Sydney Local Environmental Plan 2012.
(F) The development is consistent with the objectives of the Sydney Development Control Plan 2012.
(G) The application is supported by a Detailed Environmental Site Investigation and Remediation Action Plan that demonstrates that the site can be made suitable for the proposed development, in accordance with State Environmental Planning Policy No. 55 - Remediation of Land.
(H)
Suitable conditions of consent have been applied
and the development is considered to be in the public interest.
(I)
Part A – Deferred Commencement Conditions was
removed as the applicant has submitted
an interim audit advice letter and review of the Remediation Action Plan,
prepared by a NSW Environmental Protection Authority Accredited Site Auditor,
who advised that the submitted information satisfies the requirements of the
deferred commencement condition.
(J)
Condition
2(b) was added to ensure the Sophia Street garage door is a folding glass door,
to improve the interface with the public domain.
(K) Condition
85 was amended to remove reference to the deferred commencement condition and
to make reference to the submitted Letter of Interim Advice/Section B Site
Audit Statement.
Carried unanimously.
D/2020/766
Report author: Samantha Kruize
Publication date: 17/03/2021
Date of decision: 17/03/2021
Decided at meeting: 17/03/2021 - Local Planning Panel
Accompanying Documents: