Decision Maker: Local Pedestrian, Cycling and Traffic Calming Committee
Decision status: Recommendations Determined
2023/012669
Recommendation
It is recommended that the Committee endorse the
(A) The Applicant must comply with the Works Zone conditions as stipulated in Schedule C of this agenda.
(B) The Applicant is not permitted to operate any part of a crane over a public road or hoist/swing goods from a Works Zone across or over any part of a public road by means of a lift, hoist or crane unless a separate approval has been obtained from the City's Construction and Building Certification Services Unit as required under Section 68 of the Local Government Act 1993 and Section 138 of the Roads Act 1993.
(C) The Applicant must notify adjacent properties of the Works Zone at least 14 days prior to installation and must provide a telephone number of the supervisor responsible for the proposed Works Zone and include contact details in the notification letter to be distributed to affected stakeholders.
(D) The Applicant must temporarily remove the existing kerb and footpath adjacent the Works Zone in Hutchinson Place to provide sufficient space for a vehicle to load and unload within the Works Zone, as well as maintain vehicular access in Hutchinson Place.
(E) The Applicant must reinstate the kerb, gutter and footpath adjacent the proposed Works Zone in Hutchison Place to the satisfaction of the City's Public Domain team, once the Works Zone is no longer required and removed.
(F) The Works Zone must maintain a clear 2.6 metre travel lane in Hutchinson Place for vehicular traffic during the hours the Works Zone is in operation.
(G) The Works Zone is limited up to an Australian Standard 6metre long vehicle.
(H) The Applicant must implement appropriate traffic control measures and use TfNSW-Accredited Traffic Controllers to manage vehicular and pedestrian movement adjacent to the Works Zone during the hours of operation.
Voting
Members for this Item
Voting Members |
Support |
Object |
City of Sydney |
ü |
|
Transport for NSW |
ü |
|
NSW Police – |
ü |
|
Representative for the Member for |
ü |
|
Advice
The Committee unanimously supported the recommendation.
Background
The Walsh Group Construction has requested
The Works Zone is to facilitate construction works at 479
South Dowling Street, Surry Hills.
Report author: Nazar Badshah
Publication date: 16/02/2023
Date of decision: 16/02/2023
Decided at meeting: 16/02/2023 - Local Pedestrian, Cycling and Traffic Calming Committee
Accompanying Documents: