Pursuant to Section 4.16(3) of the
Environmental Planning and Assessment Act 1979, the panel granted a deferred commencement
consent to Development Application Number D/2024/172 subject to the conditions
set out in Attachment A to the subject report.
Reasons for Decision
The application was approved for the
following reasons:
(A)
The
proposed development is generally consistent with the relevant objectives and
controls of the Sydney Local Environmental Plan 2012 (LEP) and Sydney
Development Control Plan 2012 (DCP).
(B) Based upon the material available to the
(C)
The
proposed development complies with the maximum floor space ratio development
standard contained in Clause 4.4 of the Sydney Local Environmental Plan 2012.
(D)
The
proposed development, subject to conditions, is of an appropriate scale, built
form and design consistent with the desired future character of the area. As such, the proposed development exhibits
design excellence in accordance with the requirements contained in clause 6.21C
of the Sydney Local Environmental Plan 2012.
(E)
The
development is generally consistent with the objectives of the Sydney
Development Control Plan 2012.
(F)
Suitable
conditions of consent are recommended, and the development is considered to be
in the public interest.
Carried unanimously.
D/2024/172